Learn how to pass jobsite inspections on the first try under the 2023 NEC requirements. Rather than presenting installation code as a single list, the lesson material is organized around the inspection process itself: what happens during the rough and final inspections, and what an inspector is actually looking for during each.
Along the way, you'll cover the NEC's current requirements for running wiring underground, above ceilings, and across rooftops, along with the grounding rules that apply to panelboards, services, and transformers.
By the end, you will be able to:
- Recognize the specific items electrical inspectors check for during a jobsite visit.
- Handle inspector feedback and requirements at each phase of a project without delays.
- Install underground, above-ceiling, and rooftop wiring in a way that's ready for inspection.
- Ground panelboards, services, and transformers correctly the first time.
- Complete both rough and final inspections successfully under the 2023 NEC.
Course Format: Audio & Text
Credit Type: BE, JE, IJE, RJE, ME, RME, CEI
Course ID(s): 962942
Approved By: Department of Safety & Professional Services - Electrician
Installation Checklists (2023 NEC) [50 Activities]
- 01. Underground - 300.5(F) Backfill
- 02. Underground - 300.5(H) Bushings
- 03. Underground - 300.5(J) Earth Movement
- 04. Underground - Table 300.5(A) Minimum Cover Distance
- 05. Underground - 300.5(G) Raceway Seals
- 06. Underground - 314.27(B) Floor Boxes
- 07. Underground - 250.52(A)(3) Concrete-Encased Electrode
- 08. Rough Inspection - Rough Inspection Basics
- 09. Rough Inspection - 517.13(A) Branch Circuits Serving Patient Care Areas
- 10. Rough Inspection - 110.12(A) Unused Openings
- 11. Rough Inspection - 330.30 MC Cable; Securing and Supporting
- 12. Rough Inspection - 342.14, 344.14, and 358.14 Dissimilar Metals
- 13. Rough Inspection - Article 100 Definitions: Accessible
- 14. Rough Inspection - 300.4(A)(1) Cables and Raceways Through Wood Members; Bored Holes
- 15. Above the Ceiling - 300.11(A)&(B) Secured In Place
- 16. Above the Ceiling - 200.4(B) Multiple Circuits
- 17. Above the Ceiling - 424.66/110.26(A)(4) Duct Heaters with Limited Access Above Ceiling/Working Space; Limited Access
- 18. Above the Ceiling - 410.110(A) Special Provisions for Flush and Recessed Luminaires; Clearance from Combustible Material
- 19. Above the Ceiling - 590.3(D) Removal of Temporary Wiring
- 20. Above the Ceiling - 300.22(C) Other Spaces Used for Environmental Air
- 21. Above the Ceiling - 250.104(A)(B)(C) Bonding of Piping and Exposed Structural Steel
- 22. Above the Ceiling - 410.117(C) Luminaires; Tap Conductors
- 23. Above the Ceiling - 300.21 Spread of Fire or Products of Combustion
- 24. Rooftop - 250.110 Equipment Fastened in Place or Connected by Permanent Wiring Methods
- 25. Rooftop - 250.12 Clean Surfaces
- 26. Rooftop - 110.22(A) Identification of Disconnecting Means
- 27. Rooftop - 250.97 Bonding for Over 250 Volts
- 28. Rooftop - 440.4(B) Marking on HVAC Equipment
- 29. Rooftop - 314.23(E)&(F) Raceway Supported Enclosures
- 30. Rooftop - 210.63(A) Heating, Air-Conditioning, and Refrigeration Equipment Outlet
- 31. Service, Panelboards, Transformers - 110.24 Available Fault Current
- 32. Service, Panelboards, Transformers - 200.6 Identification of Grounded Conductors
- 33. Service, Panelboards, Transformers - 250.119 Identification of Equipment Grounding Conductors
- 34. Service, Panelboards, Transformers - 210.5(C)(1) & 235.5(C)(1) Identification of Ungrounded Conductors
- 35. Service, Panelboards, Transformers - 110.26(A)(1) Working Space
- 36. Service, Panelboards, Transformers - 408.5 Clearance for Conductor Entering Bus Enclosures
- 37. Service, Panelboards, Transformers - 250.30(A)(1) System Bonding Jumpers
- 38. Service, Panelboards, Transformers - 250.30(A)(4&5) Grounding Electrode and Grounding Electrode Conductor, Single Separately Derived System
- 39. Final Inspection - 450.10(A) Grounding of Dry-Type Transformer Enclosures
- 40. Final Inspection - 700.12 General Requirements
- 41. Final Inspection - 700.16 Emergency Illumination, Part 1
- 42. Final Inspection - 700.16 Emergency Illumination, Part 2
- 43. Final Inspection - 110.3(B) Installation and Use
- 44. Final Inspection - 427.22 Pipelines and Vessels; Ground-Fault Protection of Equipment
- 45. Final Inspection - Final Equipment Installation
- 46. Final Inspection - 700.12(H)(2)(3) Battery-Equipped Emergency Luminaires
- 47. Final Inspection - 700.11 Identification of Emergency Lighting Circuits
- 48. Final Inspection - 210.8 GFCI Protection for Personnel
- 49. Final Inspection - 110.25 Lockable Disconnecting Means
- 50. Final Inspection - 408.4(A) Circuit Directory
Course Completion
- Mandatory Questionnaire
- Certificate of Completion