This course explains updated installation methods that electricians must use to pass both rough and final electrical inspections.
The Department of Housing, Buildings and Construction-approved course covers the updated 2023 NEC requirements for installing wiring on rooftops, above ceilings, and underground.
Also included are comprehensive code checklists that cover:
- Installing and grounding panelboards, services, and transformers
- Required steps to pass rough electrical inspections
- Required steps to pass final electrical inspections
Learning Objectives:
Montana electricians who complete this course will:
- Know how to install electrical systems using the 2023 NEC that will pass the underground, above ceiling, rooftop, service, panelboard, transformer, and rough and final electrical inspections
- Understand the installation codes electrical inspectors look for on jobsites
- Confidently respond to inspector requirements during all phases of a project
After each section of the course, students must answer a multiple-choice review question. To pass the course, students must complete all 50 of these questions with a total score of at least 70%. Additionally, students will not receive credit until they spend a minimum of 200 active minutes in the course (50-minute credit hours).
Course ID(s): ELE-CE-CRS-00693
Approved By: Department of Labor and Industry - State Electrical Board
- Installation Checklists (2023 NEC)
- Installation Checklists (2023 NEC) [50 Activities]
- 01. Underground -??300.5(F) Backfill
- 02. Underground - 300.5(H) Bushings
- 03. Underground - 300.5(J) Earth Movement
- 04. Underground - Table 300.5(A) Minimum Cover Distance
- 05. Underground - 300.5(G) Raceway Seals
- 06. Underground - 314.27(B) Floor Boxes
- 07. Underground - 250.52(A)(3) Concrete-Encased Electrode
- 08. Rough Inspection - Rough Inspection Basics
- Additional Activities
- 09. Rough Inspection - 517.13(A) Branch Circuits Serving Patient Care Areas
- 10. Rough Inspection - 110.12(A) Unused Openings
- 11. Rough Inspection - 330.30 MC Cable; Securing and Supporting
- 12. Rough Inspection - 342.14, 344.14, and 358.14 Dissimilar Metals
- 13. Rough Inspection - Article 100 Definitions: Accessible
- 14. Rough Inspection - 300.4(A)(1) Cables and Raceways Through Wood Members; Bored Holes
- 15. Above the Ceiling - 300.11(A)&(B) Secured In Place
- 16. Above the Ceiling - 200.4(B) Multiple Circuits
- 17. Above the Ceiling - 424.66/110.26(A)(4) Duct Heaters with Limited Access Above Ceiling/Working Space; Limited Access
- 18. Above the Ceiling - 410.110(A) Special Provisions for Flush and Recessed Luminaires; Clearance from Combustible Material
- 19. Above the Ceiling - 590.3(D) Removal of Temporary Wiring
- 20. Above the Ceiling - 300.22(C) Other Spaces Used for Environmental Air
- 21. Above the Ceiling - 250.104(A)(B)(C) Bonding of Piping and Exposed Structural Steel
- 22. Above the Ceiling - 410.117(C) Luminaires; Tap Conductors
- 23. Above the Ceiling - 300.21 Spread of Fire or Products of Combustion
- 24. Rooftop - 250.110 Equipment Fastened in Place or Connected by Permanent Wiring Methods
- 25. Rooftop - 250.12 Clean Surfaces
- 26. Rooftop - 110.22(A) Identification of Disconnecting Means
- 27. Rooftop - 250.97 Bonding for Over 250 Volts
- 28. Rooftop - 440.4(B) Marking on HVAC Equipment
- 29. Rooftop - 314.23(E)&(F) Raceway Supported Enclosures
- 30. Rooftop - 210.63(A) Heating, Air-Conditioning, and Refrigeration Equipment Outlet
- 31. Service, Panelboards, Transformers - 110.24 Available Fault Current
- 32. Service, Panelboards, Transformers - 200.6 Identification of Grounded Conductors
- 33. Service, Panelboards, Transformers - 250.119 Identification of Equipment Grounding Conductors
- 34. Service, Panelboards, Transformers - 210.5(C)(1) & 235.5(C)(1) Identification of Ungrounded Conductors
- 35. Service, Panelboards, Transformers - 110.26(A)(1) Working Space
- 36. Service, Panelboards, Transformers - 408.5 Clearance for Conductor Entering Bus Enclosures
- 37. Service, Panelboards, Transformers - 250.30(A)(1) System Bonding Jumpers
- 38. Service, Panelboards, Transformers - 250.30(A)(4&5) Grounding Electrode and Grounding Electrode Conductor, Single Separately Derived System
- 39. Final Inspection - 450.10(A) Grounding of Dry-Type Transformer Enclosures
- 40. Final Inspection - 700.12 General Requirements
- 41. Final Inspection - 700.16 Emergency Illumination, Part 1
- 42. Final Inspection - 700.16 Emergency Illumination, Part 2
- 43. Final Inspection - 110.3(B) Installation and Use
- 44. Final Inspection - 427.22 Pipelines and Vessels; Ground-Fault Protection of Equipment
- 45. Final Inspection - Final Equipment Installation
- 46. Final Inspection - 700.12(H)(2)(3) Battery-Equipped Emergency Luminaires
- 47. Final Inspection - 700.11 Identification of Emergency Lighting Circuits
- 48. Final Inspection - 210.8 GFCI Protection for Personnel
- 49. Final Inspection - 110.25 Lockable Disconnecting Means
- 50. Final Inspection - 408.4(A) Circuit Directory
- Installation Checklists (2023 NEC) [50 Activities]
- Course Completion
- Mandatory Questionnaire
- Certificate of Completion
- Expedited Reporting Available