After completing this course for North Carolina, the participant will be able to apply 50 important changes to the 2023 National Electrical Code in common wiring practice.
Learning Objectives:
- Define the change in scope for Article 626: Electrified Truck Parking Spaces.
- Explain the new and changed requirements for construction and installation of electrical wiring for swimming pools, fountains, and similar installations.
- Identify changed requirements for labeling of photovoltaic equipment floating on bodies of water and rapid shutdown of PV system circuits.
- Define the change in scope for Article 695: Fire Pumps
- Identify updates, additions, and changes to Chapter 7 of the 2023 National Electrical Code.
- Outline new and changed requirements for emergency systems in Chapter 7 of the 2023 NEC.
- Define the changes in scope for Article 701: Legally Required Standby Systems.
- Identify changed requirements concerning signage and portable generators for optional standby systems found in Chapter 7 of the 2023 NEC.
- Describe new wiring requirements for Class 4 fault-managed power systems.
- Summarize the requirements for Class 1 power-limited circuits and Class 1 power-limited remote-control and signaling circuits covered in Article 724.
- Summarize the requirements for Class 2 and Class 3 power-limited circuits covered in Article 725.
- Outline revisions made to the listing requirements for energy management systems found in Chapter 7 of the 2023 NEC.
- Identify changed requirements for installation of circuits and supply-side overvoltage protection in fire alarm systems.
- Identify updates, additions, and changes to Chapter 8, Chapter 9, and the Annexes of the 2023 National Electrical Code.
- Describe changes in how Chapters 1 through 7 apply to Chapter 8 of the 2023 NEC.
- List changes to requirements for bonding conductors and grounding electrode conductors in buildings with and without grounding means.
- Identify new requirements for grounding or bonding of antenna systems.
- Outline new and changed requirements for network-powered broadband communication systems found in Chapter 8 of the 2023 NEC.
- Identify the update regarding measurement of nipples in Table 1 of Chapter 9 of the 2023 NEC.
- Outline new and changed requirements for conduits Annex C of the 2023 NEC.
- Summarize the information regarding use of medical electrical equipment in dwellings and residential board-and-care occupancies covered in Annex K of the 2023 NEC.
Course ID(s): CEC.05504
Approved By: State Board of Examiners of Electrical Contractors
- 2023 NEC Changes Part 4
- Chapter 6 [18 Activities]
- 01. 626.1 Electrified Truck Parking Spaces. Scope.
- 02. 630.8 Ground-Fault Circuit-Interrupter Protection for Personnel
- 03. 646.19 Entrance to and Egress from Working Space.
- 04. 680.5 Ground-Fault Circuit-Interrupter (GFCI) and Special Purpose Ground-Fault Circuit-Interrupter (SPGFCI) Protection
- 05. 680.12 Equipment Rooms, Vaults, and Pits.
- 06. 680.21(D) Pool Pump Motor Replacement.
- 07. 680.22(A) Receptacles.
- 08. 680.26. Equipotential Bonding.
- Additional Activities
- 09. 680.32 Ground-Fault Circuit-Interrupter (GFCI) and Special Purpose Ground-Fault Circuit Interrupter (SPGFCI) Protection Overview
- 10. 680.43 Indoor Installations.
- 11. 680.54(B),(C) Bonding, Equipotential Bonding of Splash Pads.
- 12. 680.58 GFCI, SPGFCI Protection for Adjacent Receptacle Outlets.
- 13. 680.59 GFCI and SPGFCI Protection for Permanently Installed Nonsubmersible Pumps.
- 14. 680.83 Equipotential Bonding.
- 15. 690.4(G) PV Equipment Floating on Bodies of Water.
- 16. 690.12(D) Buildings with Rapid Shutdown.
- 17. 694.7 Construction and Maintenance.
- 18. 695.1. Fire Pumps. Scope.
- Chapter 7 [19 Activities]
- 01. 700.3 Tests and Maintenance.
- 02. 700.4(B) Selective Load Management.
- 03. 700.11 Wiring, Class-2 Powered Emergency Lighting Systems.
- 04. 700.12(C) Supply Duration.
- 05. 700.12(E) Stored-Energy Power Supply Systems (SEPSS).
- 06. 701.1. Legally Required Standby Systems. Scope.
- 07. 701.12(C)(3) Public Gas System, Municipal Water Supply.
- 08. 701.32 Selective Coordination.
- Additional Activities
- 09. 702.7(A) Signs. Standby.
- 10. 702.12(B). Portable Generators 15kW or Less.
- 11. 705.10. Identification of Power Sources.
- 12. 706.7 Commissioning and Maintenance.
- 13. Article 724 Class 1 Power-Limited Circuits and Class 1 Power-Limited Remote-Control and Signaling Circuits.
- 14. Article 725, Class 2 and Class 3 Power-Limited Circuits.
- 15. 725.3(A) Spread of Fire or Products of Combustion.
- 16. Article 726 Class 4 Fault-Managed Power Systems
- 17. 750.6. Listing
- 18. 760.24(A) Mechanical Execution of Work.
- 19. 760.33 Supply-Side Overvoltage Protection.
- Chapter 8 [10 Activities]
- 01. 800.3 Other Articles.
- 02. 800.100(B)(2) Electrode. In Buildings or Structures with Grounding Means.
- 03. 800.100(B)(3) Electrode. In Buildings or Structures Without an Intersystem Bonding Termination or Grounding Means.
- 04. 800.113 Installation of Cables Used for Communication Circuits, Communications Wires, Cable Routing Assemblies, and Communications Raceways.
- 05. 800.179 Wires and Cables.
- 06. 810.15 Grounding or Bonding.
- 07. 830.40(B). Low-Power Circuits.
- 08. 830.47 Underground Network-Powered Broadband Communications Cables Entering Buildings.
- 09. 830.133(C) Splicing of Medium-Powered Network-Powered Communications Cables.
- 10. 830.160 Bends.
- Chapter 9 [1 Activities]
- 01. Chapter 9, Table 1. Percent of Cross Section of Conduit and Tubing for Conductors and Cables.
- Annexes [2 Activities]
- 01. Annex C, Table C.1 Conduit, Tubing, and Cable Tray Fill Tables for Conductors and Fixture Wires of the Same Size.
- 02. Annex K, Use of Medical Electrical Equipment in Dwellings and Residential Board-and-Care Occupancies.
- Chapter 6 [18 Activities]
- Course Completion
- Mandatory Questionnaire
- Certificate of Completion
- Expedited Reporting Available

